Deck Construction & Reconstruction

Fixed-price contracts

No hidden costs

5-year warranty

Permits & engineering included

Pricing (fixed price – no surprises)

Prices depend on size, material (wood vs composite), height (ground vs raised), and stairs/railings. All include footings, framing, decking, railings, stairs (up to 6), cleanup, and 5‑year warranty.


New deck construction

 
 
Deck size (sq ft)HeightMaterialPrice range
100 – 150Ground levelPressure-treated pine3,500–5,500
100 – 150Ground levelComposite (Trex)6,000–9,000
150 – 250Ground levelPressure-treated pine5,000–8,000
150 – 250Ground levelComposite (Trex)9,000–13,000
250 – 400Ground levelPressure-treated pine8,000–12,000
250 – 400Ground levelComposite (Trex)14,000–20,000
100 – 150Raised (3–4 ft)Pressure-treated pine6,000–9,000
100 – 150Raised (3–4 ft)Composite (Trex)10,000–15,000
150 – 250Raised (3–4 ft)Pressure-treated pine9,000–14,000
150 – 250Raised (3–4 ft)Composite (Trex)15,000–22,000

Sagging, splintering, or just ugly? New deck or full replacement. Wood, composite, or PVC. Built to last. Passes inspection.


What's included

New deck construction

Site assessment – Measure yard, check soil, slope, sun exposure, property lines.

Design consultation – Size, shape, height (ground level or raised). Stairs, railings, built-in benches.

Permits (if needed) – We handle all city paperwork for decks over 30" high.

Foundation – Dig footings (below frost line). Concrete piers or helical piles. Post anchors.

Framing – Pressure-treated joists (16" or 12" on center). Double beams at ledger and ends. Flashing against house.

Decking material (your choice) – Wood (cedar, redwood, pressure-treated pine), composite (Trex, TimberTech, Fiberon), PVC (azek, evergrain).

Hidden fasteners – For composite/PVC – no screws on top surface.

Railings – Wood, composite, aluminum, or glass panels. Top rail, bottom rail, balusters (code spacing – no 4" gaps).

Stairs – Stringers, treads, risers. Up to 6 stairs included (more = custom quote).

Lighting (optional) – Post cap lights, stair riser lights, recessed deck lights.

Built-ins (optional) – Bench seating, planter boxes, skirting around bottom.

Protective coating (wood decks) – Stain or sealant (one coat included).

Cleanup – Remove all debris, haul away old materials (for reconstruction), sweep deck.


Deck reconstruction (full replacement)

Demolition – Remove old decking, railings, stairs, and framing (if rotted).

Inspection – Check ledger board (attached to house). Replace if rotted.

Reuse what's good – Keep existing footings and posts if structurally sound (saves money).

New framing – Replace all rotted joists, beams, and stringers.

New decking – Your choice of material (wood, composite, PVC).

New railings & stairs – Built to current code (older decks often fail code).

Flashing – New Z-flashing where deck meets house.

Cleanup – Haul away old deck completely. No debris left behind.


What's NOT included

  • Hot tub or spa installation (we build the deck – you place the tub)

  • Outdoor kitchen or BBQ island (separate service)

  • Permanent roof or pergola over deck (add 3,000–8,000)

  • Landscape work beyond 2 ft around deck

  • Pest treatment (termites – we'll tell you if needed)

 

 


New deck construction

 
 

Add for stairs over 6 steps: +150–300 per step

Add for aluminum railings (instead of wood): +20–35 per linear foot

Add for glass railings: +80–150 per linear foot


Deck reconstruction (full replacement)

Similar to new construction pricing, minus footing cost (if footings are reusable).

 
 
Deck size (sq ft)Old materialNew materialPrice range
150WoodWood4,500–7,000
150WoodComposite7,000–10,000
250WoodWood7,000–11,000
250WoodComposite12,000–17,000

Fixed packages

Ground Level Wood Deck (150 sq ft) – from $5,500

  • Pressure-treated pine or cedar

  • Concrete footings + pressure-treated framing

  • Decking (wood) with face screws

  • Wood railings + balusters

  • 6 stairs included (if needed)

  • Cleanup + 5-year warranty

Ground Level Composite Deck (150 sq ft) – from $9,000

  • Trex or TimberTech composite decking

  • Hidden fasteners (no screws on top)

  • Concrete footings + framing

  • Composite or wood railings (your choice)

  • 6 stairs with composite treads

  • Cleanup + 5-year warranty

Raised Deck (200 sq ft, 3–4 ft high) – from 12,000(wood)or17,000 (composite)

  • Includes all footings, framing, decking, railings, stairs

  • Flashing against house

  • Skirting around bottom (lattice or solid)

  • 5-year warranty

Hillside Deck (complex slope) – custom quote (typically 18,000–35,000)

  • Helical piles or deep concrete footings (per engineer spec)

  • Multi-level or stepped deck

  • Reinforced framing for seismic

  • We handle engineering + permits

  • 5-year warranty

Deck Reconstruction (250 sq ft, wood to composite) – from $14,000

  • Remove old deck entirely (haul away)

  • Keep good footings (inspect first)

  • New framing (pressure-treated)

  • New Trex decking + hidden fasteners

  • New railings + stairs

  • Flashing + cleanup + 5-year warranty


How we work

  1. Free estimate – We visit, measure, check soil, slope, house ledger.

  2. Fixed quote within 48 hours – All materials, labor, permits, cleanup.

  3. Design approval – You approve size, shape, material, railing style.

  4. Permits – We handle all city paperwork (required for raised decks).

  5. Demolition (if reconstruction) – Old deck removed in 1 day.

  6. Construction – 5–15 days depending on size and complexity.

  7. Final walkthrough – You inspect every board, railing, and stair.

  8. 5-year warranty – On all labor and structure.

About HouseTuneUp

Yes. We provide a fixed price quote before we start — no hidden fees, no change orders. You'll know the exact cost upfront.

A full turnkey home takes 6–8 months. Bathroom remodels take 10–14 days. ADUs take 4–5 months. We give you a clear timeline before breaking ground.

No. We send weekly photo and video updates. One point of contact handles everything — permits, inspections, materials, and crew. You just approve decisions from your phone.

We turn empty lots into homes. And outdated houses into spaces you'll actually love.

Based in Los Angeles, HouseTurnUp handles the entire construction process — from site prep and foundation to framing, roofing, plumbing, electrical, finishes, and final walkthrough.

No subcontractor chaos. No surprise costs.
Just your home, built the right way.

✅ Fixed price contracts
✅ In-house crew (not random subs)
✅ Permits & inspections included
✅ 5-year warranty on everything we build

Your land. Your vision. HouseTuneUp.

Contacts

opening hours

Monday – Friday: 8:00 AM – 6:00 PM
Saturday: 9:00 AM – 2:00 PM (by appointment only)
Sunday: Closed