Bathroom Remodeling
Fixed-price contracts
No hidden costs
5-year warranty
Permits & engineering included
Pricing (fixed price)
| Bathroom type | Timeline | Price |
|---|---|---|
| Half bath (sink + toilet only) | 5–7 days | 6,500–6,500–9,500 |
| Guest bath (tub/shower combo) | 10–14 days | 12,000–12,000–18,000 |
| Master bath (standard) | 14–21 days | 22,000–22,000–35,000 |
| Master bath (luxury) | 3–4 weeks | 38,000–38,000–55,000 |
Fixed packages:
Essential Refresh – $8,900 (vanity, toilet, flooring, paint, light, no repipe)
Complete Remodel – $17,500 (full gut, tub/shower, quartz vanity, toilet, flooring, lights)
Master Spa – $34,000 (heated floors, glass shower, bench, double vanity, LED mirror)
Bathroom Remodeling – HouseTurnUp
From outdated to spa. No leaks. No surprises. Fixed price.
What's included
Demolition – Remove everything down to studs and subfloor. Haul away debris.
Plumbing – New PEX or copper pipes, drains, shut-off valves. Connect faucet, shower, toilet.
Electrical – New GFCI outlets, exhaust fan vented outside, dimmer switch, wiring for heated floors.
Framing – Replace rotted studs, build shower niche, straighten walls.
Waterproofing – Cement backer board, liquid membrane, 24-hour flood test.
Flooring – New plywood subfloor + tile, LVP, or heated floors.
Walls & ceiling – Moisture-resistant drywall, mudding, sanding, painting.
Shower or tub – Shower pan with proper slope, floor-to-ceiling tile, glass door. Or new bathtub.
Vanity & countertop – Plywood vanity, quartz/granite countertop, new faucet.
Toilet – New comfort-height, dual-flush option available.
Mirror & accessories – Mirror, towel bars, hooks.
Final trim & cleaning – Baseboards, silicone caulk, dust-free cleanup.
What's NOT included
Moving load-bearing walls
Window replacement
Whole-house repiping (only this bathroom)
Tile over $25/sq ft (you supply or pay difference)
How we work
Free estimate – We come, measure, give you a price.
Fixed quote within 24 hours – No hidden fees.
Material selection – We help, or you choose.
Permits – We handle everything.
Construction – 5–21 days, daily cleanup, weekly photo updates.
Final walkthrough – We fix issues before you pay.
5-year warranty – On all labor.
About HouseTuneUp
Do you work with my budget?
Yes. We provide a fixed price quote before we start — no hidden fees, no change orders. You'll know the exact cost upfront.
How long does a typical project take?
A full turnkey home takes 6–8 months. Bathroom remodels take 10–14 days. ADUs take 4–5 months. We give you a clear timeline before breaking ground.
Do I need to be on-site during construction?
No. We send weekly photo and video updates. One point of contact handles everything — permits, inspections, materials, and crew. You just approve decisions from your phone.
We turn empty lots into homes. And outdated houses into spaces you'll actually love.
Based in Los Angeles, HouseTurnUp handles the entire construction process — from site prep and foundation to framing, roofing, plumbing, electrical, finishes, and final walkthrough.
No subcontractor chaos. No surprise costs.
Just your home, built the right way.
✅ Fixed price contracts
✅ In-house crew (not random subs)
✅ Permits & inspections included
✅ 5-year warranty on everything we build
Your land. Your vision. HouseTuneUp.
Contacts
opening hours
Monday – Friday: 8:00 AM – 6:00 PM Saturday: 9:00 AM – 2:00 PM (by appointment only) Sunday: Closed